Thought a 2-part load block rig was faster, cost me 40 minutes at the Port of Long Beach
Swapped to a single-part line on a 6 ton pick last Tuesday thinking it'd speed things up, but the load swayed so bad I had to reset the tag line twice and re-rig, so now I'm second guessing whether part count really matters as much as I thought, what's your go-to rule for picking line parts on lighter lifts?
Sounds like that single part line taught you a lesson the hard way. Guessing the 40 minutes felt like a real fun bonus on top of the sway. Stick with what keeps the load calm, not what looks quick on paper.