Took over a 14-unit framing job in Boise and the lumber pile told me everything
Got handed a job in Boise where a crew got walked off, and the first thing I did was walk the lumber pile. The stack from 3 weeks back was full of bowed studs and split plates, but the new bundles we ordered after the switch came in straight and the waste count dropped to about 4 percent. Turned out the old crew was ordering the cheapest mix they could find and framing wet, so walls were twisting by the time the sheathing went on. We built a covered rack and let the wood sit for 10 days before cutting, and the corners squared up on the first try. Curious if any of you have a set rule for how long you let lumber sit before framing, or do you just check moisture and go?