Ran a small crew in Cleveland, and a mislabeled riser taught me to walk the site myself
Back in 2006 I was running a crew on a 4 unit apartment rehab off West 25th in Cleveland, and we were two days behind on the plumbing rough-in. I handed the print to my lead guy, who had been doing this since the 80s, and he stacked out the waste lines off what the drawing showed. Turned out the plans and the as-builts didn't match, and the riser was marked one way but the building had it another, so we cut through a joist we should have left alone. I caught it on the walk the next morning when the floor felt a little too springy under my boot, and I stopped everything right there. We spent a full Saturday sistering that joist and re-routing the line, about $600 out of pocket plus a lost weekend, but the framing inspector passed us clean on Monday. What I took from it was simple: no matter how good the guy reading the print is, somebody has to put eyes on the real thing before the saw comes out. These days I do that walk myself, mostly because the drawings and the building have a way of telling two different stories. How do you folks handle it when the plans and the as-builts disagree, do you stop and ask or push ahead and fix it later?