PSA: a sub in Dallas hung 40 sheets of drywall over wet blown insulation and now every seam is popping
Walked the job Tuesday morning and found the board screwed straight through 2 inches of damp cellulose, so I made them pull 40 sheets, dry the cavity, and rehang, and now the GC is trying to back charge us for the delay, anyone else getting burned by trades stacking wet work?