Got chewed out by an inspector on a slab pour last month and it changed my whole approach
I always thought I was fine with my control joint spacing until this county inspector in Austin told me I was asking for random cracking on a 30x40 slab. He said my 12 foot spacing was too wide for that mix design in the Texas heat. Now I keep every joint at 8 feet max and I haven't had a single call back about cracks since. Anybody else run into inspectors who actually saved them from a headache?
2 comments
Log in to join the discussion
Log In2 Comments
raymartin13d ago
Man, that's rough getting chewed out but it sounds like it worked out for the best! Nothing worse than chasing cracks on a slab you already poured. Glad that inspector woke you up before it became a real problem.