Update: tube sheet leak at the Regina plant and I went with the weld repair over the reroll
Last Tuesday at the Regina shop I found a weeping tube sheet leak on a 60-inch vessel and had to call it fast before the next shift. I went with a weld repair around the tube instead of pulling and rerolling it, mostly because we were already 2 days behind on the job. It held through hydro, but the old-timer on nights said I should've rerolled it and not risked a patch on a tube sheet that's been stressed that many times. I keep going back and forth on whether I took the shortcut or made the smart call under the gun. Curious what you guys would've done, weld it or bite the bullet and reroll?