Told the new helper to preheat with a rosebud on that 2 inch header in Gary, thought he was wasting gas, welds passed xray first try | Boilermakers - Librear
Told the new helper to preheat with a rosebud on that 2 inch header in Gary, thought he was wasting gas, welds passed xray first try
I've been doing this 14 years and always figured slow preheat was just something old timers said to sound smart. He ran it up to 400 and held it there, and the xray came back clean on all 6 joints, so now I'm the one dragging the torch around. How long do you all hold preheat on thick wall pipe before you start laying bead?