Cracked a tube sheet at the Biloxi job and had to eat crow on the water wall
Back on a boiler job in Biloxi about 6 months ago, I took a shortcut on the preheat with a weed burner instead of waiting on the rosebud, and sure enough the upper tube sheet started to bow on me. I killed the heat, let it cool slow under a blanket for about 4 hours, and walked the whole weld line with a straight edge before I touched anything else. Turned out my tack sequence was pulling it hard to one side, so I re-tacked in a jump pattern and that pulled it back most of the way. We still had to dress one spot but the hydro held at 150 psi on the first try, and my lead just shook his head and said nothing. Anyone else have a preheat shortcut bite them on a tube sheet?