It took me 47 panel swaps to figure out why my com wires kept failing
I never counted them until I saw the invoice stack on my bench, and the number that surprised me was 47 panels in 14 months, every single one where I skipped the drip loop on the exterior run came back within a year, so now I want to know if anyone else has a hard number like that where it finally clicked.